![]() |
Critical PathThis original pen and ink drawing was created for the internet messaging software giant Critical Path, as the cover for their annual report in 2000. Steele's technique and inking style give this image a striking dimension. Available for purchase, this drawing has been archivally stored and is in perfect condition. (Cover type is not included on original) Price: $425 Size: 9" x 11" Shipped Flat |
|||||||||||||
|
||||||||||||||
![]() |